The Rail Road Commission of Texas is the regulatory agency that controls all of the oil and gas drilling and production in Texas. A permit must be filed with the RRC in order to obtain a permit to establish a disposal well. The permit process takes about 90 days to complete. The prospective injection zone must be approved by the RRC and there is a limit to the amount of water per day that may be injected into the zone. There is also an injection pressure limit.